Contents: Removal 🠛 Installation 🠛
Removal
Place the vehicle on a two-post lift.
Disconnect the wires from the battery terminals, starting with the negative terminal.
Using a filling station, drain the refrigerant from the refrigeration circuitfilling station.
Remove the front bumper and front body panel.
Fig. 8.157. Bolts for fastening pipelines to the receiver-dryer: 1 – mounting bolts
[Original publication on the portal RenaultBook]
Loosen the bolts securing the pipelines to the receiver-dryer (fig. 8.157).
Disconnect the pipes.
Insert plugs into all holes.
Remove the receiver-dryer by lifting it up.
Installation
Installation is carried out in the reverse order of removal.
Note: After replacing the receiver-drier, add 15 ml of the specified oil over the volume of oil collected.
Note: Replace the sealing gaskets.
Note: To facilitate installation of the pipes, lubricate their ends with air conditioning oil.
Note: Tighten the pipe mounting bolts (10 Nm).
Note: Charge the refrigeration circuit with refrigerant using a charging station.
Note: Check the air conditioning system for proper operation by running the electric fan at maximum speed.
Note: Perform a leak search.
