Work order:
- remove the remains of old gaskets and sealant from the block;
- remove the technological plugs by drilling a small hole in the plug, screwing a self-tapping bolt into it and removing the plug by pulling the head of the bolt;
- rinse all internal passages with warm water until the water coming out is clear. Dry the block and lubricate it with a thin layer of oil;
- install new plugs for the technological holes using sealant.
[Source link is located on: renaultbook]
