Tightening torques | |
bolts (7) And (8) nozzle body linings | 25 Nm |
Bolts 9 and 16 of the lining of the injector housings | 21 Nm |
Bolt of fastening of the top cover of the drive GRM | 41 Nm |
Suspension Support Bolt | 62 Nm |
Removing
Disconnect the battery.
Remove:
- intake manifold,
- fuel rail,
- multifunctional bracket.
Remove:
- bolt (1) fixing the pendulum suspension support on the lining of the injector bodies,
- bolt (2) fastening the upper cover of the timing drive to the lining of the injector housings.
Remove:
- bolts (3) fixing the lining of the injector housings,
- injector housing lining.
Installation
The lining of the injector housings must be replaced.
Install:
- nozzle body lining,
- all bolts of fastening of a lining of cases of atomizers.
Press the lining of the injector bodies to:
- top cover of the timing drive by wrapping the mounting bolt (4) by hand,
- to the support of the pendulum suspension of the engine, wrapping the fastening bolt (5) by hand.
Attach the lining of the nozzle bodies to the linings (6) cylinder head covers.
Torque tighten in the following order:
- bolts (7) And (8) nozzle body linings (25 Nm),
- bolts 9 and 16 of the lining of the injector bodies (21 Nm).
Torque tighten:
- upper timing cover bolt (41 Nm),
- pendulum support bolt (62 Nm).
Install:
- multifunction bracket,
- fuel rail,
- intake manifold.
Connect the battery.