2. Mount the dial gauge with base plate on the cylinder block (see illustration).
6.2 Attach the dial gauge with base plate to the cylinder block
3. Measure the protrusion of the cylinder liners relative to the cylinder block with an indicator. The protrusion value must be between 0.02 mm and 0.09 mm.
When installing new sleeves, the protrusion measurement is made without the O-ring on the bearing side of the sleeve.
The protrusions of two adjacent sleeves should not differ by more than 0.05 mm.
Sleeve protrusions must either increase in ascending order from cylinder 1 to cylinder 4 or be arranged in a descending (see illustration). Otherwise, the sleeves should be reinstalled by contacting a workshop.
6.3 The protrusions of the sleeves must either increase in ascending order from cylinder 1 to cylinder 4 or be arranged in a descending